The job list - in no specific order.
Here the job list of all the items which were changed, modified or added since I purchased the boat. The order is not in sequence of importance, but as it came to mind when I was writing down the list. JOB LIST: - Removed all layers of anti-fouling. - Osmose treatment. - New anti-fouling (3 layers). - Painting of hull and deck. - Painted inside cabin. - Removal of all (SS) hardware on deck for maintenance and polish. - Removal of various holes, like old water inlet, loudspeaker in cockpit, support for fishing poles. - Mast and boom painted white. - Removed the little deck on the stern. - Removed the “spoiler” which was part of the pushpit. - Installed a new ladder on the stern. Changed the type of radar reflector. Changed cockpit drains and adjusted the connections inside, so they will drain correctly when inclined. ...